Example calculation

On this page, we’ve put together some model calculations to demonstrate just how much money you can save and how quickly an optimally scaled thermal power plant can pay for itself when used properly.

 

Example calculations for a hotel with a 6.5 KU-EG (6.5 kW electricity output) Cogenon thermal power plant

Hotel with 23 beds and a wellness area, built in 1973.
Heating system to date: Gas-powered furnace


Situation without thermal power plant
  Consumption (kWh) Price (EUR/kWh) Costs (EUR)
Gas consumption furnace 150,000 0.056 -8,420
Power consumption (covered by utility) 45,000 0.172 -7,755
Total energy costs     -16,175

 

Results with thermal power plant
  Consumption (kWh) Price(EUR/kWh) Costs (EUR)
Gas consumption thermal power plant 146,000 0.051 1 -7,446
Gas consumption furnace 47,000 0.056 -2,632
Gas consumption total 193,000   -10,078
       
Power consumption 45,000    
Power production thermal power plant 38,000  
    Own use 34,200 0.051 2 1,748
    Fed into public utility network 3,800 0.110 3 418
Additional consumption requirements
(by utility)
7,000 0.172 -1,204
Surplus from electricity production by thermal power plant     962
       
Total costs with thermal power plant     -9,116
Costs for „worry-free“ maintenance package     -1,250
Total operating cost with thermal power plant     -10,366
       
Savings     5,809
       
Total investment cost
(turn-key system)
    23,500
       
Amortization time     3.91 years

1 Lower energy prices due to tax refund
2 Guaranteed payment for CHP law for own-use cogeneration power
3 Guaranteed payment for CHP law plus kWh price of the Leipzig Power Exchange

 

 

Example calculation for a furniture store with a Cogenon CO 50 LH-EG (50 kW electricity output)

Furniture retailer with a gas furnace, purpose-built building from the 1970’s


Situation without thermal power plant
  Consumption (kWh) Price (EUR/kWh) Costs (EUR)
Gas consumption furnace 744,000 0.056 -41,664
Power consumption (covered by utility) 519,000 0.170 -88,230
Total energy costs     -129,894

 

Results with thermal power plant
  Consumption (kWh) Price (EUR/kWh) Costs (EUR)
Gas consumption thermal power plant 818,501 0.051 1 -41,744
Gas consumption furnace 164,170 0.056 -9,194
Gas consumption total 982,671   -50,938
       
Power consumption 519,000    
Power generation thermal power plant 263,559  
    Own use 244,608 0.051 2 12,475
    Fed into public utility network 18.951 0.110 3 2,084
Additional consumption requirements (by utility 254,392 0.170 -43,247
Surplus from electricity generated by thermal power plant     43,729
       
Total energy costs     -86,385
Costs for „worry-free“ maintenance package     -9,920
Total operating costs with thermal power plant     -96,305
       
Savings     33,809
       
Total investment
(turn-key system)
    85,850
       
Amortization time     2.48 years

1 Lower energy prices due to tax refund
2 Guaranteed payment for CHP law for own-use cogeneration power
3 Guaranteed payment for CHP law plus kWh price of the Leipzig Power Exchange 

 

 

Example calculation for foodstuff producer with a Cogenon thermal power plant CO 140 LH-EG (140 kW electricity production)

Foodstuff production facility with high demand for heat and electricity in an old factory hall (built around 19


Situation without thermal power plant
  Consumption (kWh) Preis (EUR/kWh) Kosten (EUR)
Gas consumption furnace 1,899,750 0.050 -94,988
Power consumption (covered by utility) 1,027,600 0.123 -125,881
Total energy costs     -220,869

 

Ergebnis mit BHKW
  Consumption (kWh) Preis (EUR/kWh) Kosten (EUR)
Gas consumption thermal power plant 2,800,880 0.045 1 -124,639
Gas consumption furnace 84,770 0.050 -4,239
Total gas consumption 2,885,650   -128,878
       
Power consumption 1,027,600    
Power generation thermal power plant 1,069,908  
    Own use 495,000 0.051 2 25,295
    Fed into public utility network 261,998 0.110 3 28,820
Additional consumption requirements
(covered by utility)
313,290 0.123 -38,535
Surplus from electricity generated by thermal power plant     15,580
       
Total energy costs with thermal power plant     -113,298
Cost for „worry-free“ maintenance package     -30,000
Total operating cost with thermal power plant     -143,298
       
Savings     77,570
       
Total investment
(sturn-key system)
    202,000
       
Amortization time     2.60 years

1 Lower energy prices due to tax refund
2 Guaranteed payment for CHP law for own-use cogeneration power
3 Guaranteed payment for CHP law plus kWh price of the Leipzig Power Exchange

Hotel with 23 beds and a wellness area, built in 1973. Heating system to date: Gas-powered furnace